Wellness Institute Rehabilitation Area Renovation:  In need of an update, the Rehabilitation Area renovation consisted of removing existing flooring and installing new, modifying the existing curtain track layout and installing new bulkheads and acoustic tile ceiling.  The majority of this work was completed after hours and on weekends.  After this project, ongoing relationships with The Wellness Institute began.

Challenge

Demolition of the existing ceiling required careful planning and coordination as to not damage or set off the existing Sprinklered fire protection system.

Solution

Collaboration with facility engineers and fire inspectors was required.  Processes were determined and followed precisely to ensure that the building remained fire protected at all times.